Глоссарий





Новости переводов

19 апреля, 2024

Translations in furniture production

07 февраля, 2024

Ghostwriting vs. Copywriting

30 января, 2024

Preparing a scientific article for publication in an electronic (online) journal

20 декабря, 2023

Translation and editing of drawings in CAD systems

10 декабря, 2023

About automatic speech recognition

30 ноября, 2023

Translation services for tunneling shields and tunnel construction technologies

22 ноября, 2023

Proofreading of English text



Глоссарии и словари бюро переводов Фларус

Поиск в глоссариях:  

Restricted area of a station

    (a) if the station has no ticket barrier—the platform, and (b) if the station has a ticket barrier—the platform and all other parts of the station between the platform and the ticket barrier.




Interim minor amendment (queensland only), английский
    (a) of an approved safety management system for a railway managed by a railway manager, means an amendment of the approved safety management system if the amendment— (i) has not been the subject of an application under section 133; and (ii) does not or will not increase the frequency or consequences of an existing hazard or risk, or allow a new hazard or risk to arise, relating to the management of the railway; or (b) of an approved safety management system for the operation of rolling stock on a railway by a railway operator, means an amendment of the approved safety management system if the amendment— (i) has not been the subject of an application under section 133; and (ii) does not or will not increase the frequency or consequences of an existing hazard or risk, or allow a new hazard or risk to arise, relating to the operation of rolling stock on tlio riilimv


Annual safety report, английский
    (a) describes and assesses the safety performance of the railway operations for which the person was accredited during the preceding 12 months, and (b) reviews any significant developments relating to the safety of those railway operations during that period, and (c) sets out any safety initiatives proposed to be undertaken in relation to the railway operations in the succeeding 12 months, and (d)details compliance with any requirements prescribed by the regulations or contained in guidelines.